Youcan bulk cement tank trailer safety use precautions

Precautions for safe use of Youcan bulk cement tank trailer

bulk cement tank trailer

1. When loading, be careful not to fill the bulk cement tank trailer, and leave some space to expand the flour particles.

2. When loading, avoid mixing the sundries into the bulk cement tank trailer to block the discharge pipe and affect the discharge speed and residual rate.

3. When unloading, if the air compressor has abnormal noise, depress the clutch pedal, turn off the engine, turn off the electromagnetic switch of the pumping unit, and work only after the fault is eliminated.

4. When unloading, pay special attention to the change of the pressure gauge, and the operator must not leave the site to avoid high pressure.

5. The bulk cement tank trailer should be kept dry every day to avoid powder agglomeration.

6. In car maintenance, parts should be prevented from falling, and knocking should be avoided to prevent parts from being damaged, deformed, bumped, scratched, etc., and parts must be cleaned during installation and maintenance;

7. When the air compressor is working, people should avoid standing on the side of the air compressor.

8. When accelerating, do not use too much force on the accelerator, and the force should be even.

9. Remember not to use external air source to exhaust.

10. When the compressor stops working due to other reasons during the decompression process, close the air inlet valves of the front and rear chambers, and then open the external air source; wait for a while, close the external air source, and open the air inlet valves of the front and rear chambers.

11. Special attention: after unloading for the first time, be sure to check the bolts and U-bolts of the fulcrum, and tighten each bolt one by one; after that, each bolt should be checked regularly. its tightened.

12. Inflatable and pressurized, when the pressure in the bulk cement tank trailer is too high and the safety valve is opened, the exhaust valve can be opened to reduce the pressure.

13. When the water tank enters the water, the water should be released in time through the two water discharge valves at the bottom of the water tank. If the fluidized bed canvas is damp, the fluidized bed canvas should be replaced in time to avoid material agglomeration.

14. During the unloading process, if the unloading needs to be terminated in other abnormal situations, the unloading disc valve can be closed first, and then the pressure in the fluidization chamber can be released through the opening of the exhaust valve.